Project management with CPM and PERT
Material type:![Text](/opac-tmpl/lib/famfamfam/BK.png)
- 658.502 M69P
Item type | Current library | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
![]() |
Mohinder Singh Randhawa Library | 658.502 M69P (Browse shelf(Opens below)) | Available | 79586 |
Browsing Mohinder Singh Randhawa Library shelves Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
658.502 M34F Finding the critical path | 658.502 M39 I Integrated manufacturing systems | 658.502 M68E Essentials of simulation | 658.502 M69P Project management with CPM and PERT | 658.502 M79C Critical path; construction and analysis | 658.502 O 53 S Systems analysis for business and industrial problem solving | 658.502 O53S Systems analysis; selected readings |
There are no comments on this title.
Log in to your account to post a comment.